Kings Cross Re-Signalling

Client: Siemens Mobility Limited.
Service: E&P Signalling Power.

Overview

We were contracted by Siemens Rail Automation (SRA) to undertake the GRIP 5-8 deliverables for Kings Cross Re-Signalling – E&P Signalling Power.

Consisted of the renewal of station approaches and rationalisation of the life-expired Switches & Crossings. As part of the new signalling works, new signalling power was required between Kings Cross & Holloway. To facilitate the new signalling power a new PSP was installed & an ASP at Holloway. The signalling power system utilised auto reconfiguration equipment requiring double end fed supplies.

We carried out the following construction activities.

  • Signalling Power Distribution / Cabling
  • UPS
  • PSP Equipment Room Building Services
  • Heating and Ventilation
  • Fire Alarm
  • ASP Power Distribution / Cabling
  • REB Trackside LV Electrical Supply
  • FTN Trackside LV Electrical Supply
  • Earthing and Bonding
  • Cable Route
  • DNO Design /Technical Support / Liaison
  • Isolation Transformer