Railway Electrical Services were contracted by Siemens Mobility Limited to undertake the GRIP 5 design and GRIP5-8 construction for Kings Cross Re-Signalling – E&P Signalling Power.
Consisting of the following activities;
- Signalling Power Distribution / Cabling
- UPS
- PSP Equipment Room Building Services
- Heating and Ventilation
- Fire Alarm
- ASP Power Distribution / Cabling
- REB Trackside LV Electrical Supply
- FTN Trackside LV Electrical Supply
- Earthing and Bonding
- Cable Route
- DNO Design /Technical Support / Liaison
- Isolation Transformer