We plan our works around broader construction programmes and seasonal requirements for points heating operation to minimise downtime of the installation.
- Point heating control cubicles
- DNO/Distribution cubicles
- Transformers
- Trackside connection boxes
- Temperature probes
- Strip heaters, clamp lock heaters, heat retainers
- Cable Management
- Enabling Works, including disconnection and removal of redundant equipment.