Skip to content

DIRFT Phase 3

Client: Winvic.
Service: E&P.

Overview

Railway Electrical Services were contracted by Winvic to carry out the Electrical Services associated with the installation of Point Heating and Walkway Lighting for the DIFT III project.

Our scope of works covers the following activities:

  • DNO’s, 1 & 2.
  • Distribution Cubicle.
  • Point Heating Control Cubicles; PHCC A, B & C.
  • Lighting Control Cubicles; A, B & C.
  • Cubicle Bases and Trough Routes.
  • REB supplies.
  • FSP’s including supply transformer.
  • Walkway lighting.
  • Point Heating.
  • Testing & Commissioning and Lux Level Surveys.
  • Installation of bases for the 138 raise/lower columns.