Kings Cross Re-Signalling
Client: Siemens Mobility Limited.
Service: E&P Signalling Power.
Overview
We were contracted by Siemens Rail Automation (SRA) to undertake the GRIP 5-8 deliverables for Kings Cross Re-Signalling – E&P Signalling Power.
Consisted of the renewal of station approaches and rationalisation of the life-expired Switches & Crossings. As part of the new signalling works, new signalling power was required between Kings Cross & Holloway. To facilitate the new signalling power a new PSP was installed & an ASP at Holloway. The signalling power system utilised auto reconfiguration equipment requiring double end fed supplies.
We carried out the following construction activities.
- Signalling Power Distribution / Cabling
- UPS
- PSP Equipment Room Building Services
- Heating and Ventilation
- Fire Alarm
- ASP Power Distribution / Cabling
- REB Trackside LV Electrical Supply
- FTN Trackside LV Electrical Supply
- Earthing and Bonding
- Cable Route
- DNO Design /Technical Support / Liaison
- Isolation Transformer