Dawlish
Client: Bam Nuttall.
Service: Electrical and SISS comms.
Overview
Railway Electrical Services were contracted by BAM Nuttall for the Electrical and SISS comms package as part of the Colonnade to Coastguards Phase 2 at Dawlish. This package of works consisted of two locations, Underside Bridge Lighting and Platforms 1 & 2 including the new Footbridge.
Our scope of works covered the following:
Underside Bridge
- Replacement of new single phase MCCB in the Resort Hut.
- Installation of LCC2 and Connection Box (CB1).
- LED strip lighting and Design Plan luminaires under the bridge.
- Recover 4 x Design Plan Tuscans which now remain redundant.
- Recovery of redundant supply to LCC.
Platforms 1 & 2 including new Footbridge.
- Installation of Distribution Cubicle and supply cable.
- Single and Three Phase supplies to the Lift Motor Rooms.
- Platform column lighting.
- Supplies to CIS.
- CCTV.
- PA.
- New double sided NTI’s and SOD.
- Installation of comms cabinet outside the LMR on Platform 1.
- Containment for comms on Platform 2 canopy and new tray along Station Building on Platform 1.
- Testing and Commissioning.