Beighton to Woodhouse

Client: Siemens.
Service: E&P Design / Installation.

Overview

We were contracted by Siemens to undertake E&P Design / installation and commissioning of a new brick-built PSP at Woodhouse Junction comprising of the following:

  • 400V Maintained and non – maintained switchboards complete with automatic generator changeover panel.
  • 650V switchboard
  • 400/650V signalling power transformers
  • Dual rectifier UPS system and bypass facility along with external load bank connection point
  • 400V diesel standby generator backup with a 400V mobile generator connect facility and external re-fuelling point
  • M&E services within the new PSP building (lighting / power / HVAC / external compound lighting / fire alarm)
  • Remote and condition monitoring
  • 650V feeder termination
  • LV supplies to new REB / HABD / FTN-X
  • Installation of points heating at Woodhouse Junction
  • Isolation and disconnection of LV supplies to 3 signal boxes