Beighton to Woodhouse
Client: Siemens.
Service: E&P Design / Installation.
Overview
We were contracted by Siemens to undertake E&P Design / installation and commissioning of a new brick-built PSP at Woodhouse Junction comprising of the following:
- 400V Maintained and non – maintained switchboards complete with automatic generator changeover panel.
- 650V switchboard
- 400/650V signalling power transformers
- Dual rectifier UPS system and bypass facility along with external load bank connection point
- 400V diesel standby generator backup with a 400V mobile generator connect facility and external re-fuelling point
- M&E services within the new PSP building (lighting / power / HVAC / external compound lighting / fire alarm)
- Remote and condition monitoring
- 650V feeder termination
- LV supplies to new REB / HABD / FTN-X
- Installation of points heating at Woodhouse Junction
- Isolation and disconnection of LV supplies to 3 signal boxes