case study

Case Studies

Bletchley

Client: Signalling Solutions 
Type of Project: Points Heating and Buffer Stop Lighting
Value: £118k

The Design and Installation of points heating, buffer stop lights and motor-operated switches as part of the Bletchley re-modelling project.  

The scope of works covered included:
  • Recoveries
  • Distribution Network Operator supplies
  • Point heating control cubicles
  • 400/230V cables
  • Transformers
  • Heaters
  • Rail temperature probes
  • Buffer stop lights
  • Motor-operated switches (power supplies)
  • Civil Works