Newark Castle

Newark Castle

Client: Alstom
Type of Project: Modular Re-signalling Project

The scope of the project covered the GRIP 4 – 8 works for the East Nottinghamshire including the resignalling of the NOG1 Line between Allington Junction and Rectory Junction and the resignalling of the NOB1 Line between Lowdham and Newark castle.

This project included the following works by RES:
•E&P cable termination
•Installation of E&P Earthing
•Installation of Generator Pillar onto Concrete Base
•Installation and Commissioning of UPS
•SIRAS End-to-End Testing
•E&P Cable Jointing
•Installation and Commissioning of Point Heating Equipment
•Installation of Ventilation Cowls on Top of SI-REBS
•Installation and commissioning of level crossing lighting
•Inspection & testing activities