mobberley Level crossing

Case Studies

Mobberley

Client: Carillion
Type of Project: 650v Cable Alterations
Value: £80K

The works consisted of the renewal of the life-expired level crossing equipment at Mobberley and Deganwy Level Crossings.

Typical tasks that were carried out included;
  • Signalling power supply alterations
  • Installation of a signal box
  • REB works
  • Cable installation and termination
  • Switching and isolation
  • Earthing