hero

Case Studies

Great Western

Client: Amey Colas
Type of Project: S&C Renewals

Under the Great Western Switch and Crossing Renewals contract, a number of switches, throughout the Western Territory were being re-laid and renewed.

This meant there was a requirement for the installation of a new point heating system or modifications to the existing point heating installation.

RES were tasked with;
  • DNO Supply
  • Cutting & Welding of Rails
  • Troughing
  • Removal / Installation of Track Components
  • Installation of Top Ballast
  • Installation of Hot and Cold probes
  • Survey and Inspections
  • Testing & commissioning