KO2 Works

KO2 Works

Client: Balfour Beatty Rail
Value: £2.5M

The Thameslink KO2 Programme was developed to deliver a major expansion of the cross-London Thameslink Service. This involves the provision of longer, more frequent trains, serving a more extensive network to deliver a substantial increase in passenger capacity through the centre of London.

As part of the KO2 project RES have carried out works at numerous sites, these works include;
  • DNO supplies and client liaison.
  • DNO / Distribution modifications.
  • Points Heating.
  • Sub Distribution equipment for LV power supplies to Re-locatable Equipment Building’s, Trackside Equipment Housing’s and Controlled Track Devices.
  • LED lighting systems and LV power distribution within Archways.
  • Access stair lighting for Office / Stores cabins.
  • Car park lighting column installation.
  • Temporary LV power installations.
  • Cable management systems for lighting and LV power distribution.
  • 400v/230v/110v Cable installation.
  • 7 day Load Monitoring.
  • Testing and Commissioning of LV Installations.
  • HV Bonding.
  • Civil base construction for DNO / Distribution / Points Heating equipment.
  • Concrete trough installation.